APMT Act 18अध्याय 0 · Preliminary
धारा 18 · Power to underpin building or otherwise strengthen it
अक्षर आकार — स्तर 1, कुल 4 में से
(1)
If the tramway operator is of opinion that it is necessary or expedient to do so for facilitating the construction of tramway system or for ensuring the safety of tramway system or any building or construction along the tramway system alignment, it may, after following the procedure under sub-section (2), underpin or otherwise, strengthen any building within a radius not exceeding fifty meters from the tramway system alignment.(2)
The tramway operator shall give to the owner or occupier of such building at least ten days notice in writing before undertaking the work of underpinning or otherwise strengthening the building:Provided that where the tramway operator is satisfied that an emergency exists, no such notice shall be necessary.(3)
Where the underpinning or strengthening was executed in connection with,-(a)
the carrying out of the works upon the land where any building is situated; or(b)
the construction or operation of tramway system,(i)
in a case referred to in Clause (a) above, from the date of completion of such works; and(ii)
in a case referred to in Clause (b) above, from the date on which traffic was opened in the tramway system;इस धारा पर आपका निजी नोट
यह नोट सिर्फ़ आप देख सकते हैं।